Friday, October 11, 2019

planning blog : scripts, costumes, props

Today in class we are making our plan for our commercial. My partner and I have to go over many things to use as props, costumes, and make our schedule. We will also need to include our locations in which we film and a backup plan just in case we are unavailable to access any of the things listed. It is crucial to get these things down to ensure a smooth, orderly film process and to also avoid missteps in the process. We will be using the track for filming to represent a thirsty athlete taking a sip of his/her water after he’s finished running.. The runner will wear shorts, a thin shirt, and running shoes. I love the idea of this very much and can't wait to begin filming soon.

Props:
-Zephyrhills water bottle
-Small towel (for sweat)
-Map of Florida

Costume:
-Shorts(white)
-Thin shirt(black)
-Running shoes(black)
-Medium length socks(black)

Schedule:
October 15th- Editing lesson and start our storyboard.
October 21st- CCR Lesson and get approval of our storyboard.
October 23rd- Start filming at track (get most of the commercial, if not all, done.)
October 25th- Get more clips in just in case or finish the filming process. We will also start editing today.
October 29th- Finish editing our commercial (final project)

Location List:
-Track
-Bleachers (near track)

Back-up plan:
In case we can't film on the track we will film in front of building 17 and/or in front of the cafeteria. We will be able to improvise on the costume by being able to switch up colors freely without major consequences. Our schedule is pretty set and can't really be behind it if we wish to have a good commercial with a better grade.no

No comments:

Post a Comment